1. |
26-Aug-2025 06:00 PM |
03-Sep-2025 11:00 AM |
03-Sep-2025 11:30 AM |
[Providing Internal Electrification of newly constructed BPHU at Maracherra CHC under R.D. Ambassa Division during the year 2025-2026.]
[33/EE/RDD/ABS/JNR/25-26][2025_CERDD_64995_1]
|
Chief Engineer, Rural Development Department||Superintending Engineer Circle-4, CE, RDD||Executive Engineer Dhalai Division-1
|
2. |
27-Aug-2025 10:00 AM |
03-Sep-2025 11:00 AM |
03-Sep-2025 12:00 PM |
[Repair and Maintenance of Sabroom Dak-Bungalow under RD Satchand Division during the financial year 2025-26 (Part-I]
[eDT-02/SE-VII/S/STC-DIV/DNIT Dt 25/08/2025][2025_CERDD_65015_1]
|
Chief Engineer, Rural Development Department||Superintending Engineer Circle-2, CE, RDD||Executive Engineer Southern Division-2
|
3. |
28-Aug-2025 09:00 AM |
03-Sep-2025 12:00 PM |
03-Sep-2025 12:30 PM |
[Mtc. of different Roads under PWD(R and B), Rupaichari Sub Division during the year 2025-26/ SH - Repair to pot holes, Patch Carpeting and Sand seal coat etc.]
[15(04)/PNIeT/25-26. 32/DNIeT/EE/SBM/DIVN/25-26][2025_CEPWD_65025_1]
|
Chief Engineer, PWD (R and B)||SE, PWD (R and B), Third Circle||EE Sabroom Division
|
4. |
28-Aug-2025 09:00 AM |
03-Sep-2025 12:00 PM |
03-Sep-2025 12:30 PM |
[FDR/Mtc. of Different roads under Magurchera GP, Manu Bazar GP, Satchand GP during the year 2025-26]
[15(05)/PNIeT/25-26. 33/DNIeT/EE/SBM/DIVN/25-26][2025_CEPWD_65026_1]
|
Chief Engineer, PWD (R and B)||SE, PWD (R and B), Third Circle||EE Sabroom Division
|
5. |
28-Aug-2025 09:00 AM |
03-Sep-2025 12:00 PM |
03-Sep-2025 12:30 PM |
[Mtc. Of different roads under Sabroom PWD(R and B) Sub-Division during the year 2025-26. / S.H - Pot hole repairing, patch carpetting, sand seal coat, Paver Block etc.]
[15(01)/PNIeT/25-26. 29/DNIeT/EE/SBM/DIVN/25-26][2025_CEPWD_65022_1]
|
Chief Engineer, PWD (R and B)||SE, PWD (R and B), Third Circle||EE Sabroom Division
|
6. |
28-Aug-2025 09:00 AM |
03-Sep-2025 12:00 PM |
03-Sep-2025 12:30 PM |
[FDR / Maintenance Of different roads under Sabroom PWD(R and B) Sub-Division during the year 2025-26/ SH -Solling, Paver block, Repair to pot holes, Road Side Protection, Removal of Unsuitable Soil etc.]
[15(02)/PNIeT/25-26. 30/DNIeT/EE/SBM/DIVN/25-26][2025_CEPWD_65023_1]
|
Chief Engineer, PWD (R and B)||SE, PWD (R and B), Third Circle||EE Sabroom Division
|
7. |
28-Aug-2025 09:00 AM |
03-Sep-2025 12:00 PM |
03-Sep-2025 12:30 PM |
[Urgent Maintenance of Road from NH-208 to Rupaichari PWD Office(L-2.80Km) in between Ch.0.000 km to Ch.2.80km during the year 2025-26/ SH - Patch metalling, Patch Carpeting and Sand seal coat on old bituminous surface etc.]
[15(03)/PNIeT/25-26. 31/DNIeT/EE/SBM/DIVN/25-26][2025_CEPWD_65024_1]
|
Chief Engineer, PWD (R and B)||SE, PWD (R and B), Third Circle||EE Sabroom Division
|
8. |
28-Aug-2025 09:00 AM |
03-Sep-2025 12:00 PM |
03-Sep-2025 12:30 PM |
[FDR/Mtc of Manugaht-Amlighat road to Mandali Para Via Manughat PHC during the year 2025-26]
[15(06)/PNIeT/25-26. 34/DNIeT/EE/SBM/DIVN/25-26][2025_CEPWD_65027_1]
|
Chief Engineer, PWD (R and B)||SE, PWD (R and B), Third Circle||EE Sabroom Division
|
9. |
13-Aug-2025 06:00 PM |
03-Sep-2025 02:00 PM |
03-Sep-2025 03:00 PM |
[ Project Proposal for Setting up of Centre of Excellency for Flower in Tripura SH A) Estimate for supplying of various planting material Bed preparation Technical support RPC Fertilizer for 01 (one) year, equipment and electrification]
[UNo198/Sect/Agri/Horti/2025-26][2025_AGRI_64681_1]
|
Director Agriculture||Directorate of Agriculture||Chief Engineer Agriculture||Executive Engineer West
|
10. |
20-Aug-2025 04:30 PM |
03-Sep-2025 03:00 PM |
03-Sep-2025 03:30 PM |
[Vertical extension of Dayarampara PHC along with Ramp, Jampuijala RD Block, under Sepahijala District during the F.Y. 2025-26 (PWD SoR 2023). ]
[eDT- 15/ VER EXTENSION/ DAYARAM PARA/ JMP/SPJ/SERDC-V /EE/RD /BSGD /2025-26][2025_CERDD_64851_1]
|
Chief Engineer, Rural Development Department||Superintending Engineer Circle-1, CE, RDD||Executive Engineer Western Division-2
|